The community’s call for a time-based 40 km/h speed limit on Doncaster Road has been successful. Doncaster Road is managed by the Victorian Government through the Department of Transport and Planning (DTP). DTP will be installing new electronic signage and they expect to complete works by the end of June 2026. The speed limit will apply between Aylmer Street and The Moor between 7 am and 7 pm.
Help us refine the draft design
We're making improvements to the public spaces at Balwyn North Village. Right now we're refining the draft design and prioritising potential improvements to the area. We want your input on what improvements are most important to you.
The Village, as it’s fondly known to locals, is located on Doncaster Road. This pocket of shops, cafes and restaurants, begins at the intersection with Bulleen Road and continues past Marwal Avenue.
Doncaster Road shopping strip
Some of the improvements we're investigating include new footpath surfaces, larger bins that can hold more waste or recycling, new bike racks, more rest areas and replacing the topiary trees with new greenery.
View some of these proposed changes on the interactive map and tell us your priorities by completing the short survey.
Improving the car park features
Availability of parking is one of The Village’s greatest strengths, with 249 parking spots across the shopping centre. We completed a parking audit in October 2025 and this showed there are parking spots available in the 3 car parks managed by Council, even at peak times.
We’re going to make parking here even more appealing by introducing electric vehicle chargers, moving the disabled parking closer to the shops and widening tight turning areas. This will reduce the number of spaces by 4.
Also, we are investigating the planting of trees to provide shaded parking spaces. This could remove up to 12 spaces.
Improvements to the car parks will enhance the experience for visitors.
What’s already happening
-
-
✔ Temporary planter boxes along Doncaster Road
We all want more greenery along this shopping strip, so the local businesses are installing temporary planter boxes for the next 3 years, due to begin this autumn. This will give new greenery time to settle in and flourish.
Ongoing advocacy for road safety
-
✔ Doncaster Road pedestrian crossing
Doncaster Road is managed by the Victorian Government through the Department of Transport and Planning (DTP). We’re working with DTP to introduce smoother and more accessible ramps at the Doncaster Road pedestrian crossing. We’re also advocating for longer walk times and for the height of the crossing buttons to be lowered to the normal position. The buttons are too high which means they’re hard to reach for people in wheelchairs. -
✔ Near-misses at the intersection
We’ve raised with DTP community reports of near-misses at the Bulleen and Doncaster Roads intersection.
Draft design
Select the hotspots below to find out more. If you're viewing this map on a mobile, we recommend using a larger screen.
What we can improve
What we can improve
-
Street furniture
-
Hard landscaping
-
Soft landscaping
-
Bike racks
-
Wayfinding signage
-
Pedestrian crossings
-
Arrangement of on-street parking bays and parking restrictions
-
Safety features
-
Street cleaning, waste and recycling
-
Public seating area
What we’re not seeking feedback on
What we’re not seeking feedback on
|
Mix of shops
and businesses
|
|
| Condition of privately owned buildings |
|
| Disability parking bays |
|
| Electric vehicle (EV) chargers |
|
| New loading zone in the Bulleen Road car park |
|
| Parking restrictions and sensors |
|
| Inside the public toilet |
|
Share your thoughts and take our survey
Come and chat with us at a pop-up session
Where – We'll be at 70 Doncaster Road, Balwyn North (outside the arcade entrance)
Date – Thursday 23 April 2026
Time – 9:30 am to 11 am
Car parking audit
-
This parking audit was completed in October 2025. It shows that parking is available, which is one of the shopping strip’s key strengths. We're also aware the car parks have some short periods of heavy use during special events.
| Parking locations (see map below) |
Total car spots available | Saturday 11 am peak 25 October 2025 |
Thursday 12 pm peak 30 October 2025 |
|---|---|---|---|
|
Doncaster Road (on-street) |
41 |
14 | 17 |
|
Bulleen Road car park |
64 | 48 | 41 |
|
Macedon Avenue car park |
83 | 29 | 53 |
|
Marwal Avenue car park |
61 | 35 | 46 |
| Total | 249 available | 126 used (51%) | 153 used (63%) |
Map of parking locations
Plan your next visit
Contact us
If you have any questions or if you prefer a paper survey, please contact us:
| Name | Landscape and Design team |
|---|---|
| Phone | 03 9278 4444 |
| boroondara@boroondara.vic.gov.au | |
| In writing | Private Bag 1, Camberwell Victoria 3124 |
Related consultation
-
Shaping our local shopping centres
Find out moreThanks to everyone who had their say to improve public spaces in their local shopping strip or village.